ESSEX & SUFFOLK WATER 2002

 

An exisiting gauging hut was to be upgraded to fit a modern Shaft Encoder in the stilling well connected to a Isodaq VF4 Series Data Logger with GSM and Page Switch Options together with a local display. The Shaft Encoder level was also to be transmitted via a low power Radio link to Aberton Pumbing Station.

 

Existing mechanical float recorder

 

New Instrumentation Panel with Shaft Encoder mounted

 

Solar Panel mounted on a short mast

 

Gaugeboard installed upstream of weir crest

 

Aberton Reservoir Pumping Station 4 kms distant

 

Low Power Radio Receiver mounted in the Pumping Station Outputs feed into E & S Water SCADA System

 

Aerial on the Pumping Station Roof

Halcyon Solutions, Lawday Link, Upper Hale, Farnham, Surrey. GU9 0BS

Tel/Fax: 01252 715765 contact us Email: Halcyon-Solutions

If you experience any problems with this site, then please contact the Webmaster .

Designed by Wiseup Web Designs. Last updated 10/12/06