Foulden Common  2001 

Driven by the Environment Agency's Asset Management Plan ( AMP3) Anglian Water Services set in motion a series of projects with Ewan Group plc, who in turn contracted the supply and installation of 6 borehole and 2 surface water logging systems to Halcyon Solutions.

 

The driver for this scheme being the Habitats Directive which defined that the site was drying out, leading to decline of fen communities and scrub invasion

 

A super December day on Foulden Common

 

Shaft Encoder monitoring the water level in the Mere with stock fence protection
Gaugeboard in the Mere
Shaft Encoder , Data Logger and Battery Box in Enclosure

Gooderstone Fen Spring Drain

Shaft Encoder , Data Logger and Battery Box in Enclosure with stock fence protection
Gaugeboard in the Spring Stream
Gooderstone Fen Lower and Middle Chalk Boreholes
Logger Mounting Frame with handle

An OBH at a residence in Oxborough

At survey

Enclosure ground mounted on new slab
Dipping Porthole in base of enclosure

A remote residence near Oxborough

The property's own production borehole water supply
Logging equipment mounted in a pole mounting enclosure in the garden

Central Oxborough OBH

At survey
Pole mounting enclosure mounted on existing fixings

Hottentot OBH on Foulden Common

Manual Dipping in high summer
Installation completed in December

Halcyon Solutions, Lawday Link, Upper Hale, Farnham, Surrey. GU9 0BS
 

Tel/Fax: 01252 715765 contact us Email: Halcyon-Solutions

If you experience any problems with this site, then please contact the Webmaster .

Designed by Wiseup Web Designs. Last updated 17/01/06